Upgradation of El Wastani Plant Fire Fighting System And Fire & Gas Deduction System

Upgradation of El Wastani Plant Fire Fighting System And Fire & Gas Deduction System

About Project

  • Project Management Scope; Including project control plan, planning structure.
  • Engineering Scope; Including design review and verification, design of civil works, stress analysis for the existing pipe rack, detailed engineering, construction and installation engineering and as built drawings.
  • Procurement Scope; pumps, firefighting devices, HDPE piping, CS piping, painting system, PLC System,
    F & G devices, cables, electrical & accessories.
  • Construction Execution Scope; ?Including civil work , mechanical , piping , electrical , instrumentation & control.
  • Pre-commissioning SCOPE, Commissioning, Performance test & Startup